This project consisted of the rehabilitation and replacement of approximately 3,000 LF of city neighborhood / residential streeta. The project included the removal and replacement of the paving section, and the concrete curb and gutters. The previous curb was 4” high mountable and was replaced with 6” high standard barrier curb.
Approximately 33 new driveway interfaces were required. The project also included the extension of the storm drainage system to alleviate runoff at key intersections along this alignment.
|