Military Installation Traffic Engineering Studies

Client: Multiple
Location: Nation-Wide

Back to Projects List
 
Project Details Project Images

GUERNSEY has completed numerous traffic engineering studies for military installations.

Redstone Gate Traffic Study, Huntsville, AL - This project consisted of a traffic study of six gate entrances for access control assessment. The study was to address the current site conditions and the total through-put traffic at the six active access gates, and to provide recommendations for changes. The project included on-site traffic counts and gathering of data for the report. Contract Fee - $33,118.00

Tinker Gate Study, Tinker AFB, OK – This project included a gate study at three different entrances to Tinker Air Force Base. The purpose of this study was to determine how the three gates with direct access to I-40 could be modified to better handle traffic. Contract Fee - $32,000.00

Tinker Gate Study, Tinker AFB, OK- This project included the study of seven gate entrances to Tinker AFB. The purpose of this study was to determine whether all gates should be in full operation during the peak flow of traffic to allow for more efficient personnel placement and proficient security measures. Contract Fee - $8,000.00