The ODOT traffic engineering study included the Reno Avenue to Air Depot Boulevard / I-40 corridor, approximately four miles of study area. The purpose of the engineering study was to determine the safety of exit ramps, extending frontage roads and feasibility of changing frontage roads from two-way traffic to one-way traffic.
|
 |
|