Land Services
When a major infrastructure improvement is planned, the first step is often the acquisition of right-of-way and the moving of interfering utilities. One dilemma that must be overcome is to acquire enough right-of-way to construct the project while impacting the adjacent property owners as little as possible. This often requires a detailed coordination between design and land services.
GUERNSEY understands the inherent needs for quality land services. Our staff integrates potential right-of-way and utility relocation issues into the design process from the initiation of the project. This aids in early identification of potential problems, for which there is often a design solution that will eliminate or reduce the impact all parties involved.
GUERNSEY’s right-of-way qualifications include:
- Preliminary title and existing right-of-way research
- Subordination mortgage activities
- Right-of-way engineering and plans
- Misery reports
- Master addendum and/or Fair Market Value (FMV) studies
- Warranty deed and easement document preparation
- Final title research
- Appraisals
- Acquisition
|
Utility relocation services include:
- Identification of affected utility owners
- Distribution of construction plans
- Relocation plan preparation
- Utility field meetings
- Review of relocation proposals
- Field monitoring of relocation
|
Right-of-way and utility relocation services are provided for transportation projects, water and wastewater projects, the oil and gas industry and the electric power industry.
|